Belfast City Hospital

Project Design Engineers Ltd (PDE) were commissioned by the Belfast Health and Social Care Trust (BHSCT) to carry out a high level study on the potential installation of a Battery Energy Storage System (BESS) at 4 hospitals within the Trust.

The purpose of the study was to explore the technology available, the challenges, Pros and Cons and the opportunities & incentives of large battery energy storage.